Friday, 29 June 2012

Roof lights and Solar sorted

Been a busy week, had a few days of dodging he rain but managed to fit in getting the 2 roof lights in and got the rails bolted down for the 2x 80w solar panel ordered from Germany. They arrived just as I was packing away, so popped them on and wired in parralel to an IP67 box on the roof ready to wire back to the MPPT controller when that arrives from China.
Managed to get 2 (yes 2!) 12v compressor fridges, but had to collect from Norfolk, with a detour for 2 water tanks in Milton Keynes it was a 420 mile trip!

No comments:

Post a Comment